Gas Prepayment Meter System Replacement Project: Decision on the High-Level Design The CRU has today, 10 June 2025, published its Decision Paper on the High-Level Design of Gas Pay-As-You-Go Meter System Replacement Project. The CRU received responses from relevant stakeholders to its Consultation Paper on the High-Level Design of Gas Pay-As-You-Go Meter System Replacement Project between December 2024 and February 2025, and evaluated these responses in arriving at this Decision Paper. The CRU envisages a more detailed consultation on specific aspects of the project later in 2025, ahead of the roll-out of the replacement meters in 2027.